Fishing vessel bridge representing the MarRest resource library

MarRest Resources for Fishing Vessel Compliance

Use this resource library to navigate MarRest guides by operational task: compliance foundations, inspection readiness, fatigue and rolling-window control, and software selection.

Quick Answer

MarRest resources help fishing vessel operators understand STCW-F compliance, Norwegian rest-hour documentation, fatigue monitoring, inspection readiness, rolling-window calculations, and software selection in one guide library.

Bridge of a fishing vessel at sea
Practical guides built from real time on the bridge.

Compliance Foundations

Start here when you need the regulatory baseline and practical work/rest controls for fishing vessels.

STCW-F Compliance Guide

Understand STCW-F, ILO C188, Norwegian practice, rolling rest limits, split-rest controls, and evidence workflows.

Inspection Readiness

Use these resources to prepare records, crews, and evidence packages before audits or inspections.

STCW-F Compliance Checklist

A practical checklist for rest records, rolling limits, split-rest evidence, overrides, and training documentation.

Maritime Rest-Hour Inspection

See what inspectors commonly request and how to present coherent planning, execution, and corrective-action evidence.

Fatigue and Rolling Windows

Build confidence in rolling 24-hour and 168-hour checks, fatigue trends, and schedule intervention decisions.

Hours of Rest Calculator

Test work periods against rolling 24-hour and 168-hour rest checks plus split-rest conditions.

Software and Process Selection

Compare workflows and decide when spreadsheets or broad maritime tools no longer fit fishing fleet operations.

Frequently Asked Questions

Where should a fishing operator start?

Start with the STCW-F compliance guide if you need the regulatory and operational baseline. Then use the checklist and inspection guide to turn that baseline into evidence and routines.

Which pages explain Norwegian documentation?

Use the Norwegian fishing vessel rest-hour compliance guide for local documentation options, including KS-0300 style evidence and watch plan/operations plan workflows in an ISM system.

Which resource helps with rolling 24-hour and 168-hour checks?

Use the hours of rest calculator to test entered work periods against rolling 24-hour and 168-hour rest checks, then read the fatigue monitoring guide for operational context.

See MarRest in Your Fleet

Request a free demo and walk through rest hour compliance with captains who built the system.

Request a Demo